Power your home with a certified 3kW on-grid solar plant. Claim the flat ₹78,000 PM Surya Ghar subsidy, get official KSEB bi-directional net metering, and eliminate your bi-monthly electricity bills.
A 3kW on-grid solar power plant is the most widely installed capacity across Kerala homes with bi-monthly KSEB bills between ₹4,000 and ₹9,000. It produces 360 to 450 units every month, powering inverter air conditioners, water pumps, refrigerators, and entertainment systems.
₹1,95,000 – ₹2,05,000
Complete EPC turnkey package: Tier-1 TOPCon panels, Solis/Growatt smart inverter, hot-dip structure, wiring, and KSEB net-metering liaison.
- ₹78,000
Maximum central residential subsidy. Credited directly to your linked Aadhaar bank account within 30 days after KSEB commissioning.
₹1,17,000 – ₹1,27,000*
Your actual net financial investment. *Final pricing may slightly differ based on roof accessibility and height.
Depending on your power outage frequency and budget, choose the configuration best suited for your roof:
| Configuration | Gross Cost | PM Subsidy | Net Cost | Battery Backup | Best For |
|---|---|---|---|---|---|
| 3kW On-Grid (Grid-Tied) | ₹1,95,000 | ₹78,000 | ₹1,17,000 | No (Grid banking) | Maximum ROI; homes with stable KSEB grid |
| 3kW Hybrid (with 5kWh Lithium) | ₹3,25,000 | ₹78,000 | ₹2,47,000 | Yes (4–6 hours) | Uninterrupted power during blackouts + bill offset |
| 3kW Off-Grid (Independent) | ₹2,50,000 | ₹0 (No central subsidy) | ₹2,50,000 | Yes (Lead-acid/Lithium) | Remote farmhouses or areas without KSEB grid |
Solis Green India only uses Tier-1 ALMM & DCR certified components that endure Kerala's extreme humidity, salty air, and torrential monsoon seasons:
Under the PM Surya Ghar initiative, public sector banks like State Bank of India (SBI) and Canara Bank provide simplified collateral-free rooftop solar loans for systems up to 3kW:
✨ Result: Your electricity bill savings completely cover your monthly EMI, leaving you with positive cash flow from month one!
Check Loan EligibilityA complete 3kW on-grid solar plant costs between ₹1,95,000 and ₹2,05,000 before subsidy. With the ₹78,000 central subsidy under PM Surya Ghar Muft Bijli Yojana, your net investment is just ₹1,17,000 to ₹1,27,000 including all approvals, net-metering, and 5-year AMC.
A 3kW system produces an average of 12 to 15 kWh (units) daily, which equals 360 to 450 units per month. For a home that currently receives bi-monthly KSEB bills between ₹4,000 and ₹9,000, it brings electricity bills down to near ₹0.
Solis Green registers your application on the National Portal for Rooftop Solar (pmsuryaghar.gov.in) and coordinates KSEB technical feasibility approval. After installation and bi-directional meter testing, the ₹78,000 subsidy is deposited directly into your bank account within 30 days.
Yes. A 3kW system generates ample power to easily run 1 or 2 energy-efficient inverter air conditioners along with a double-door refrigerator, water motor, washing machine, LED lights, and television.
The standard KSEB solar registration and feasibility fee is ₹1,180 (including 18% GST). Net meter testing fees range between ₹500 and ₹1,000 depending on the electrical section. Solis Green handles all paperwork and meter testing logistics.
With monthly savings averaging ₹3,500 to ₹4,500, the payback period is 2.5 to 3.5 years. Since solar panels carry a 25-to-30-year performance warranty, you enjoy over two decades of free electricity after recouping your investment.
Let our certified engineers inspect your roof, evaluate KSEB transformer feasibility, and provide a guaranteed subsidy quote.